San Jose Evergreen Community College District
Citizens' Bond Oversight Committee
2019-2020 Annual Report
Measures X and G-2010 Featured Projects
As of June 30, 2020

SJCC: Career Education Complex

Project Description: New construction of a Career Education facility, renovation of Building 200, and associated site work required to join the two facilities as one complex. The complex will house classrooms, labs, instructional support spaces, offices, and shared spaces to support student life.

SJCC: Softball Field Renovation

Project Description: Refurbish the existing softball field complex with work to include; new artificial turf-field replacement, new press box, netting and fencing for foul balls, and ADA upgrades as noted in the ADA survey.

SJCC: New Maintenance and Operations Building and Emergency Operations Center

Project Description: This project includes the construction of a new building to house Maintenance and Operations and the Emergency Operations Center, and includes site improvements, underground utilities, and parking.

EVC: Language Arts Building

Funded by Measures X and G-2010

Project Description: This project will encompass building a multi-story classroom and office building. There will be associated site work necessary to deliver the project. The building will run on the same north-south axis as the existing Auto Technology building. This new orientation will allow for a better pedestrian connection from the central green to the student parking lots to the north of campus. This project will also encompass the pathway running from the Student Services Center to the Library. The pathway will include ADA upgrades. Connecting the Language Arts building to the central green is essential. A promenade will be considered with this project.

EVC: General Education Building

Project Description: This Design-Build project will provide a new multi-level classroom building. The building may have double-loaded corridors. The number of classrooms, offices, student gathering space and lecture halls will be determined in the programming phase of this project.

EVC: Gullo II Multipurpose Remodel

Project Description:
This project will remodel the multipurpose center inside Gullo II and improve the usability of the gathering space on the exterior of Gullo II. Gullo II Multipurpose Room will be converted into a campus-wide community meeting and event space that will serve the campus and public communities. This will include modernizations to the projections system, sound system, mechanical shades, painting, flooring, IT, and FF&E. The approximate size of this renovation is 3,500 square feet. The approximate linear feet of mechanical shades is 110 feet at a two-story height. The improvements to the exterior gathering space may include shade structure(s), and seating to make the implementation of a community gathering and event space more viable. This project will create a unique identity for this portion of the campus quad.

Go Back
Home Print Friendly version Measure G-10 Bond Overview Measure X Bond Overview Project List Featured Projects